Solar & Battery Regulation & Incentive Programs
North Carolina has statewide permitting requirements for wind energy facilities. Any wind turbine or collection of wind turbines located within a half mile of each other with a collective rated capacity of one megawatt (MW) or greater must receive a permit from the Department of Environment and Natural Resources (DENR) before starting construction. The legislation provides details regarding the process and timeline for obtaining a permit, siting considerations, approval criteria, fees, and other requirements. Refer to the legislation for the full details.
Name | Enacted Date | Effective Date | Expired Date |
---|---|---|---|
N.C. Gen. Stat. § 143-215.115, et seq. | 05/17/2013 | 05/17/2013 |