Compare Solar Panels & Manufacturers

Compare East Lux Energy EL365MS-72-BDVP vs Vidursolar VS10 L3 P117

East Lux Energy

EL365MS-72-BDVP

Model: EL365MS-72-BDVP

Series: EL355-375MS-72-BDVP(5BB)

Manufacturer: East Lux Energy

Rated Power: 365 Wp

EnergyPal East Lux Energy  Solar Panels EL355-375MS-72-BDVP(5BB) EL365MS-72-BDVP
Warranty Terms

Output Warranty:

12 Years of 90% Output Power, 25 Years of 80.7% Output Power

Materials Warranty: 12 Years


Panel Performance

Rated Power: 365 Wp

Efficiency: 18.6 %

Voltage at Maximum Power VMPP: 38.9 V

Current at Maximum Power IMPP: 9.39 A

Open Circuit Voltage VOC: 47.7 V

Short Circuit Current ISC: 9.8 A

Power Tolerance Positive: + 3 %

Maximum System Voltage: 1500 V


Solar Panels Thermal Ranges

Operating Temperature Range: 40~85 °C

Temperature Coefficient of Pmax: -0.37 %/°C

Temperature Coefficient of Voc: -0.3 %/°C

Temperature Coefficient of Isc: 0.05 %/°C


Solar Panel Attributes

Weight: 27 kg

Cell Type: Bifacial

Cell Count: 72

Glass Thickness: unknown

Juntion Box Protection Class: IP 67

Cable Length: unknown

Glass Type: Anti-reflection Coating

Vidursolar

VS10 L3 P117

Model: VS10 L3 P117

Series: VS0-20 L3 P105/117/130

Manufacturer: Vidursolar

Rated Power: 117 Wp

EnergyPal Vidursolar Solar Panels VS0-20 L3 P105/117/130 VS10 L3 P117
Warranty Terms

Output Warranty:

unknown

Materials Warranty: unknown


Panel Performance

Rated Power: 117 Wp

Efficiency:

Voltage at Maximum Power VMPP: 83 V

Current at Maximum Power IMPP: 1.41 A

Open Circuit Voltage VOC: 111 V

Short Circuit Current ISC: 1.66 A

Power Tolerance Positive: unknown

Maximum System Voltage: unknown


Solar Panels Thermal Ranges

Operating Temperature Range: unknown

Temperature Coefficient of Pmax: unknown

Temperature Coefficient of Voc: unknown

Temperature Coefficient of Isc: unknown


Solar Panel Attributes

Weight: 86 kg

Cell Type: Thin film(a-Si)

Cell Count: unknown

Glass Thickness: unknown

Juntion Box Protection Class: unknown

Cable Length: 1000 mm

Glass Type: Tempered